Masonry and concrete work on Staten Island

Staten Island is the odd one out, and anyone who works across the city can see it in the buildings. Of roughly 116,700 tax lots carrying a building, about 93% are one- or two-family houses and only 21% were built before 1940. It is the newest and the most suburban housing stock in New York, and that changes almost every job.

Call (929) 412-6597 Send photos

A borough of detached houses

In the rest of the city most homes are attached, so only the front and rear walls see weather. Here they are mostly detached or semi-detached, which means four exposed elevations instead of two, plus the land around them.

That reverses what we get called for. Across the bridge the work is overwhelmingly walls and facades. On Staten Island the typical job is the ground: the driveway, the front steps, the path, the patio, a retaining wall holding back a sloped yard. There are only about 1,700 walk-up apartment buildings in the entire borough, and just 52 lots with a building over six storeys — against 7,688 in Manhattan. The facade inspection cycle barely exists here.

Landmark approval is rare too. Around 200 lots sit in a historic district, about 0.2% of the borough, concentrated in St. Paul’s Avenue–Stapleton Heights and St. George / New Brighton. Outside those few streets it simply does not come up.

What we do most here

Newer brick wants a different mortar

Four-fifths of Staten Island was built after 1940, which flips the usual advice. On a pre-war Brooklyn wall the danger is using mortar that is too hard for soft old brick. Here most brick is modern and fired harder, and a cement-based mix is normally the right answer.

We still check rather than assume, because the pre-war fifth of the borough is real and concentrated in the older North Shore neighbourhoods. The point is that the mix follows the wall, not a habit. The reasoning is on our brick pointing page.

Slopes, soil and water

The island has the steepest ground in the city, and that shows up in the work. Sloped lots put sideways pressure on retaining walls, which is why so many of them lean or bulge over time. A wall that is moving needs drainage behind it, not just rebuilding, or it will move again.

Ground that slopes toward a house also drives water at the lower walls and the base of the steps. Often the real fix is grading and drainage rather than more concrete, and we would rather say that than sell you a slab that will fail the same way.

Neighbourhoods

We cover the whole borough: Great Kills, Tottenville, New Dorp, Stapleton, Annadale, the West Shore, the North Shore and everywhere between. Travel from the Bronx is a real part of the day here, so we try to group island work rather than making separate trips, and we will be straight with you about scheduling instead of promising a morning we cannot keep.

Get a price

For driveways, paths and patios a rough measurement plus a photograph is usually enough for a sensible range. Call (929) 412-6597 or use the estimate form. You get the scope in writing, itemised. Half when the work starts, half on completion.

Building-stock figures: NYC Department of City Planning PLUTO, via NYC Open Data, November 2026. Counts are tax lots carrying a building.