Facade repair and restoration
A facade is the whole outer skin of the building, not one wall. Restoring it means repairing everything that has stopped doing its job: the mortar joints, the damaged brick or stone, the steel hidden inside the wall, the parapet at the top and the coping that caps it. On buildings over six storeys it is also a legal obligation with its own deadlines.
- NYC DCWP licensed
- Workers’ comp & disability on file
- Certificate of insurance available on request
Call (929) 412-6597 Send photos or your report
What a facade report means if you have one
Under the Facade Inspection and Safety Program, owners of buildings higher than six storeys must have the exterior walls and appurtenances inspected every five years by a qualified exterior wall inspector, and file a technical report with the Department of Buildings. The requirement sits in Construction Code §28-302.1 and 1 RCNY §103-04, and filings go through DOB NOW: Safety.
The report puts every condition into a category, and the category decides your deadline:
| Category | What it means | What has to happen |
|---|---|---|
| Unsafe | A condition that is a hazard now | Repaired within 90 days of the report being filed, with public protection in place in the meantime. An amended report follows within two weeks of the work being finished |
| SWARMP | Safe with a repair and maintenance programme: not dangerous today, but it will be | Repaired before the next cycle. Left alone, the same condition is normally rated unsafe next time |
| Safe | No action required this cycle | Nothing, until the next inspection |
The inspection and the repair are deliberately separate jobs. The inspector who writes your report is a qualified exterior wall inspector, an engineer or architect, and we are not that. We are the contractor who carries out the repairs the report calls for, and then the inspector verifies and files. Be wary of anyone offering to inspect and repair as one package: the point of the rule is that somebody independent decides what is wrong.
Why the 90 days is tighter than it sounds
An unsafe condition usually means pedestrian protection goes up straight away, and that protection stays until the repair is signed off. If the sidewalk shed sits there for a year, that is a year of rental, a year of a dark storefront, and a year of complaints. The clock is not really 90 days to repair; it is 90 days to repair before the expensive part of the problem starts compounding.
So the useful question at the start is not "what does the repair cost" but "how fast can the protection come down". That depends on scope, access and weather, and it belongs in the estimate rather than being discovered later.
What we repair on a facade
- Mortar joints across whole elevations, in a mix matched to the wall. See brick pointing.
- Spalled, cracked and displaced brick or stone, cut out and replaced.
- Steel lintels and shelf angles that have rusted and lifted the masonry above them. See lintel replacement.
- Parapets, the most commonly cited condition on these reports, because they weather on several faces.
- Coping stones and wall caps, and the open joints between them that let water into the top of the wall.
- Cracked or blown stucco and render over masonry. See stucco.
- Wall surfaces that stay saturated even with sound joints. See wall waterproofing.
Pedestrian protection, honestly
Sidewalk sheds are required by the Building Code when work or danger calls for them, and they have real rules behind them: a minimum five-foot width, eight feet of clearance in the passageway, lighting at all times, a deck rated to carry load, and fire escapes kept clear. They are permitted work in their own right, approved by the Department of Buildings before they go up, with a separate Department of Transportation permit if the shed reaches into the street. Where there is an immediate threat, a shed can go up first and the application follow within 24 hours.
Who erects the shed on your job is a question to settle at the estimate. [OWNER TO CONFIRM: competing-quote wording]
How we price facade work
The three things that move the number are the area of wall being touched, how we reach it, and how much of what is behind the surface turns out to be bad. The first two we can measure. The third is why our scope lists what is included, what is excluded, and what becomes a change order.
On facade work that honesty matters more than anywhere else, because nobody can see inside a wall from the street. A contractor who quotes a flat number for "facade repairs" without stating a brick-replacement count is either carrying a large contingency in the price, or planning to have an awkward conversation later.
[OWNER TO CONFIRM: masonry warranty]
Landmarked buildings
In a historic district, exterior work needs Landmarks Preservation Commission approval before it starts, and the Commission can ask for a mortar sample matching the original in colour, texture and strength. On a facade job this runs in parallel with the inspection report deadlines, so it is worth starting early rather than at the point the scaffold is booked.
Questions owners and boards ask
Does my building need a facade inspection at all
The five-yearly FISP cycle applies to buildings higher than six storeys. A three-family house is not in the programme. That does not mean the wall is somebody else’s problem: the separate annual parapet observation requirement reaches far smaller buildings, and §7-210 liability for anything that falls applies to every owner.
Can the repairs wait until the next cycle
An unsafe condition cannot: that is a 90-day obligation. A SWARMP condition legally can wait until before the next cycle, but it rarely should. The same condition deteriorating for five more years tends to be rated unsafe at the next inspection, which means protection and a deadline rather than a planned repair at your own pace.
Why did the report list so many conditions
Inspectors record what they see, and a wall that has gone five years without attention usually has several related things wrong at once, all with the same cause. Open joints let water to the steel; the steel rusts and moves the brick; the moved brick opens more joints. One repair sequence often addresses most of the list.
Where we do this work
The Bronx, Queens, Brooklyn and Manhattan.
Send us the report
If you are holding an inspection report, send it with a few photographs. We will tell you what the repair sequence looks like and roughly how long protection would need to stay up. Call (929) 412-6597 or use the estimate form.
Official source: NYC DOB, Facade & Local Law. Where this page and the Department disagree, the Department is right.