Bathroom remodeling in New York City
A bathroom is a waterproofing job with tiles on it. That is not a slogan — it is the reason bathrooms fail, and the reason the failure shows up on somebody else’s ceiling two years after the work looked finished. The tile is the part you choose. The layer behind it is the part that decides whether the room lasts.
Waterproofing is a trade this company already does on the outside of buildings, every week. Doing it inside a shower is the same principle at a smaller scale, and it is the reason we are comfortable putting it at the top of this page instead of in the small print.
- NYC DCWP licensed
- DOB-registered General Contractor
- Waterproofing is our own trade
Call (929) 412-6597 Send photos on WhatsApp
Why bathrooms leak, and why it is never the tile
Tile and grout are not waterproof. Grout is porous, and it is supposed to be. Every tiled shower relies on a continuous waterproof layer behind the tile, carried up the walls, across the floor, and — the part most often skipped — properly bonded into the drain and turned into the corners and the junctions.
When a shower leaks, it is almost always one of four places: the junction where the wall meets the floor, the corners, around the drain, or at the threshold where the waterproofing stops short. None of them is visible once the tile is on, which is exactly why they get rushed by anyone pricing a bathroom to be the lowest number on your table.
So on our jobs the waterproofing is a stage with its own day, not a coat of something brushed on before the tiler arrives. If you are comparing quotes, ask each contractor what system they use behind the tile and how the drain is detailed. The answers will separate them faster than anything else you can ask.
Moving the bathroom is a different job from replacing it
Keeping the toilet, the basin and the bath or shower where they are means the waste lines stay as they are, and the job is strip-out, waterproofing, tiling, fixtures and finishes. Moving any of them means drainage re-run with the fall it needs, and in an apartment that usually means the floor build-up or the ceiling below becomes part of the conversation.
The toilet is the least forgiving of the three. Its waste needs both fall and a route, and a toilet moved a few feet is a far bigger change than a basin moved the same distance.
Who does the plumbing and the electrics
On our jobs, plumbing and electrical work is carried out by licensed subcontractors, not by our own crews. That matches how the permits work here: plumbing and electrical permits are issued separately to the individual licensed contractors who perform the work rather than to the general contractor. A master plumber pulls the plumbing permit; a licensed electrician pulls the electrical one. We coordinate the sequence and stand behind the finished room.
Bathrooms also bring electrical work that is easy to overlook at quoting stage: extraction, lighting that is rated for the location, a heated towel rail or underfloor heating if you want one, and the protection all of that needs. Those are named items in our estimate, not an allowance.
What needs a permit
- Relocating the toilet, basin, bath or shower waste — any change to the drainage
- New circuits or outlets, and most added electrical work
- Moving or removing walls, including to borrow space from a bedroom or hallway
- Adding a bathroom where there was not one
Replacing fixtures where they stand, retiling and redecorating sit at the other end. We tell you which yours is before the design is settled. The renovation hub has the licence and permit position in full.
Co-ops and condos: wet-over-dry and the floor below
In an apartment building you are working above somebody’s ceiling, and your building knows it. Expect an alteration agreement, and expect two particular points of scrutiny: wet-over-dry, meaning most buildings will not allow a new wet area to sit above a neighbour’s bedroom or living room, and the requirement for proper waterproofing with evidence that it was done.
Both are reasonable, and both are easier to design around at the start. We will provide the certificate of insurance naming the building and the managing agent, which has to be arranged with the insurer rather than typed in by us. Certificate of insurance available on request.
Extraction, and the windowless New York bathroom
A great many bathrooms in this city have no window at all, which makes mechanical extraction the only thing standing between the room and a mould problem. It is also the item most often undersized, vented into a ceiling void rather than to the outside, or left running off the light switch so it stops the moment you leave — which is exactly when the room is at its wettest.
So we treat the fan as part of the waterproofing strategy rather than as an electrical afterthought: sized for the room, ducted somewhere real, and on a run-on timer or a humidity sensor so it keeps working after you have gone. In an internal bathroom this matters more than any product you put on the walls.
Small bathrooms, and what actually makes them feel bigger
Most New York bathrooms are small, and most of the advice about them is about tile colour. The things that genuinely change how a small bathroom works are duller and more structural: a door that swings the right way or slides instead, a basin with a real usable edge rather than a decorative one, a shower enclosure with a door that does not need a metre of clear floor to open, and storage built into the depth of the wall where the studwork allows.
Borrowing space is the other option, and it is worth pricing even if you reject it. Taking 150mm from a hallway or a cupboard on the other side of a non-structural wall can be the difference between a shower you edge into and one you can stand in. It also changes the job category, because it is a wall alteration — so it is a decision to make early.
Pre-war bathrooms: what the strip-out finds
Old bathrooms in this city sit on a lot of history. The common finds are a thick mortar bed under the old floor tile, which is heavy and slow to remove; cast-iron waste that is sound but awkward to join to modern pipe; joists that have been notched by a previous plumber more than they should have been; and asbestos, which turns up in old floor tile, its adhesive and pipe lagging, alongside lead paint on old woodwork.
Asbestos and lead are licensed specialist work and we do not self-perform them. Where a strip-out looks likely to disturb either, testing happens first. We would rather lose two weeks to a test than put that into your home’s air.
The water test, and why we do it before tiling
Once the waterproofing is on and before a single tile goes up, a shower floor can be blocked at the drain, filled, and left to stand. If the level drops, something is wrong and it is still cheap to fix. If it holds, you know the one thing about a bathroom that is otherwise impossible to know until it fails.
It costs a day of the programme. We would rather lose the day, and if you are in an apartment above somebody, so would your downstairs neighbour and your building. Ask any contractor you are comparing whether they do it; the answer tells you how they think about the parts of a job nobody can see.
What it costs, and the sequence
Every estimate is an itemised written scope of work, with exclusions stated. Half when the work starts, half on completion. The price moves on whether anything is relocated, the licensed trades involved, what the strip-out finds behind the old tile, your building’s requirements, and the fixtures and tile you choose.
On the programme: a bathroom is out of use for the whole job, so if it is the only one in the home, say so at the first conversation and we will plan the sequence around that rather than around our own convenience.
Our workmanship warranty: Two-year written warranty on our workmanship, from the day the job is signed off.
Already have a written quote? Send it over. We will go through it with you line by line, tell you what it covers and what it leaves out, and give you ours against the same scope.
The Bronx, Queens, Brooklyn, Manhattan and Staten IslandSend photographs
Each wall, the floor, the ceiling, and the existing positions of the toilet, basin and bath or shower. Tell us whether it is a house, a co-op or a condo, whether it is your only bathroom, and whether you want anything to move.