Residential roofing for New York City houses
This page is about the sloped, shingled roof on a house: the kind you can see from the street, on a one- or two-family home in the Bronx, Queens, Brooklyn or Staten Island. It is a different job from the flat roof on an apartment building, and it is governed by different parts of the Building Code.
Most of what you will read elsewhere about New York roofing is written about flat roofs, because that is what most of the city has. The result is that homeowners are quoted sloped roofs using flat-roof habits. Below is what the city actually requires on a pitched roof, quoted from the code itself, so you can read any estimate you are given, including ours, and know whether it covers the job.
- NYC DCWP licensed
- One- and two-family houses
- Free written estimate
Call (929) 412-6597 Send photos of the roof
My roof already has two layers of shingles. Can a third go on top?
No. This is the single most useful thing to know before you take a quote on a house roof, and it is the question we are asked most often once people find out it has an answer in writing.
The Building Code separates two different jobs. A roof replacement is defined in section 1511.3: it “shall include the removal of all existing layers of roof coverings down to the roof deck.” A roof recover is the cheaper option, where a new covering goes over the old one. Section 1511.3.1.1 then lists the conditions under which a recover is not permitted at all:
- where the existing roof or covering “is water soaked or has deteriorated to the point that the existing roof or roof covering is not adequate as a base for additional roofing”;
- where the existing covering “is slate, clay, cement or asbestos-cement tile”;
- where “the existing roof has two or more applications of any type of roof covering.”
So on a house that has already been re-shingled once, a tear-off is not an upsell. It is the only lawful version of the job. If a quote offers to lay new shingles over what is already two layers, that quote is cheaper because it is not allowed, and you are the one left with the roof. Count the layers at a cut edge, or ask whoever is quoting to show you.
The same section is why a slate roof cannot simply be covered over either. Slate has to come off. Section 1511.5 adds that existing slate or tile may be put back, “except that damaged, cracked or broken slate or tile shall not be reinstalled”, and that flashing, metal edgings and collars must not be reinstalled where they are rusted or deteriorated. Reusing the sound slates and replacing the broken ones is a real method; reusing tired flashing to save a few dollars is not.
Does a pitched roof in New York City have to be a light colour?
Usually it has to meet a reflectance standard, yes, and almost nobody mentions it on a house job. This is the part of the code that gets reported as the “cool roof” rule and then discussed only in terms of flat roofs.
Section 1504.9 sets two tiers, and the dividing line is a slope of two units vertical in 12 horizontal. At or below it — a flat or near-flat roof — the covering has to reach 0.70 initial solar reflectance together with 0.75 thermal emittance, or satisfy the whole requirement with one figure, a Solar Reflectance Index of 82. That is the white-roof rule everyone has heard of. The same section then keeps going, and this is the half that gets dropped: above two in 12, the numbers fall to 0.25 reflectance with that same emittance figure, or an SRI of 39.
A pitched roof is therefore not exempt. It has a lower bar, and it is a bar that ordinary dark shingles can fail. Two things follow, and they are worth knowing before you choose a colour:
- Material can take you out of the rule entirely. Exception 6 to section 1504.9 exempts any roof “composed of glass, metal, clay or concrete tile or plastic/rubber intended to simulate clay or concrete tile, wood, or slate.” Asphalt shingles are not on that list. A metal or slate roof is exempt by material; a shingle roof is not.
- A small job can fall outside it. Section 1511.1 says the reflectance requirement does not apply where the area recovered or replaced is less than 50 per cent of the roof area and less than 500 square feet. Both have to be true, so a patch usually escapes it and a full re-roof does not.
In practice this means the shingle you choose is a code question and not only a taste question, and that the manufacturer’s SRI figure for the specific product belongs in the paperwork for a full replacement. On a job where the look matters more than anything, it is also an argument for metal or slate rather than a dark shingle.
The slope decides the underlayment, and the slope is measurable
Shingles have a minimum pitch. Section 1507.2.2 says asphalt shingles “shall only be used on roof slopes of two units vertical in 12 units horizontal (17-percent slope) or greater.” Below that, shingles are the wrong product, whatever anyone is willing to install.
Between two in 12 and four in 12, the same section requires a double underlayment application. Section 1507.2.8 describes it: a strip of underlayment at least 19 inches wide starting at the eaves, then 36-inch sheets with each sheet overlapping the last by 19 inches. At four in 12 or steeper, one layer is enough, lapped two inches.
That single provision is responsible for a lot of shallow porch roofs and rear extensions that leak within a few years. The main roof of a house is often steep enough for single underlayment, while the porch or the back addition is shallower and needs two layers. A crew working at one speed across the whole house will underlay the shallow section as if it were the steep one. The low pitch is where wind-driven rain backs up, so it is also the section that shows the mistake first.
Shingles also need something solid to be nailed to: section 1507.2.1 is a single sentence, “asphalt shingles shall be fastened to solidly sheathed decks.” Spaced boards, the old way of decking a roof under slate or wood, are not a base for shingles without sheathing over them.
The ice barrier at the eaves, and how far in it has to go
New York winters put the hardest wear at the bottom edge of a pitched roof, where melting snow refreezes over the cold overhang and water backs up under the shingles. The code answer is section 1507.2.8.1, and it is specific about the dimension:
An ice barrier that consists of at least two layers of underlayment cemented together or of a self-adhering polymer modified bitumen sheet shall be used in lieu of normal underlayment and extend from the lowest edges of all roof surfaces to a point at least 24 inches inside the exterior wall line of the building.
Two details in that sentence decide whether it was done properly. It is measured from inside the exterior wall line, not from the gutter or the edge of the overhang — so on a house with a deep overhang the membrane has to run well up the roof, further than a single course looks like it should. And it goes in instead of the normal underlayment there, not as a strip laid on top of it. The exception is narrow: detached accessory structures with no conditioned floor area, which means a garage, not the house.
If you are comparing estimates, this is a good line to look for. “Ice and water shield at the eaves” with no dimension is a phrase. A quote that says how far up the roof it runs is a scope.
The roofer says the plywood underneath is soft. Does that change the job?
It changes the paperwork, which is why it is worth knowing before anyone is standing on your roof with the old shingles already off.
Which jobs the Department of Buildings treats as a minor alteration or ordinary repair, and so lets proceed with no permit, is set out in the department’s rule on permit categories (1 RCNY §101-14). Under its “IV. Roofs” heading the line is drawn at the deck. Roof repair or replacement “limited to the roof membrane, roof coverings, cant strip, and any insulation above the roof deck/sheathing” needs no permit, provided the Energy Conservation Code does not require more insulation. Roof work “that includes replacement of roof deck/sheathing” does need one.
So soft plywood found mid-job is the moment a permit-free reroof becomes a filed job. An honest estimate says in advance what happens if the deck is bad: how it is priced, who files, and what the delay is. Ours states it as an exclusion with a unit price rather than leaving it to be discovered.
Two things about that rule are easy to miss, and both are in its own text. The rule says the tables “are not an exclusive list”. And an exemption from a DOB permit is not an exemption from everything else: §101-14(c) states it does not remove the obligation to file with other agencies, “including but not limited to the Landmarks Preservation Commission… Department of Transportation… or the Fire Department”, nor to file with DOB for related work “such as, for example, associated sidewalk protection, structural work, electrical connections, or plumbing connections.” On a narrow street or a landmarked block, the roof may need no permit while the protection below it does.
Permits on roofs are covered properly, at length, on our Manhattan site: when a NYC roof needs a permit and when it does not. There is no point in us writing it twice.
Is a shingle roof allowed on a nearly flat roof?
No, and the threshold is the one above: two units vertical in 12 horizontal. Below that, shingles are outside section 1507.2.2 and the roof needs a membrane system instead of a shingle system.
This matters on New York houses more than it would elsewhere, because so many of them are hybrids: a pitched front roof over the main house and a flat roof over the rear extension, or a shallow mansard above a flat top. One house can genuinely need two different roofing systems, and the junction between them is where the detailing has to be right. Section 1511.1.1 is blunt about the flat part: “reroofs shall provide positive drainage.” Water has to be able to leave.
If your roof is flat or mostly flat, you are on the wrong page of ours, and we would rather say so than sell you a shingle. The links below point to the right one.
What we install on a pitched roof
We work on asphalt shingle, metal and slate roofs on houses.
Worth saying plainly that these are three different trades rather than three options on a menu: shingle, metal and slate use different crews, different tools and fail in different ways, and slate is specialist work. So ask on the phone which of them we would self-perform on your particular roof, and what we would rather send elsewhere. You will get a straight answer, and on a slate roof that answer matters more than on a shingle one.
One thing you may expect to see here and will not: we advertise no manufacturer certification. The roofing directories are full of certification badges, we hold none on file, and inventing one would be the easiest lie on the internet to tell.
Gutters and downspouts
We fit and replace gutters and downspouts, and on most of our roofs it is the same visit rather than a second trade on a second day. It is worth doing together, because a new roof draining into a gutter that has pulled away from the fascia undoes a good part of what the roof was for.
Where gutters matter most on a New York house is not the gutter itself but what happens at the bottom of the downspout. Water that leaves the roof correctly and then lands against the wall is the same water, in a worse place: it soaks the brick at the base, it sits where the sidewalk meets the building, and in February it freezes there. That is how a roof problem turns into a wall problem. Taking the discharge away from the building is concrete and drainage work, and we do that too.
So when we quote a gutter, we will ask where the downspout currently puts the water, and if the answer is “against the house” we will say so. Replacing the gutter without moving the discharge is a job that looks finished and solves nothing.
If your roof is not a pitched one
This page is only about sloped, shingled, metal and slate roofs. Most of the flat and low-slope roofs in the city are a different job with different materials, and they are ours too — just not on this page.
- Flat and low-slope roof repair — the roof on most Bronx, Brooklyn and Queens row houses.
- A roof that is leaking now.
- Roof replacement, pitched or flat.
- Walk-ups and mixed-use buildings.
- commercialroofing.nyc — our commercial side: warehouses, retail and office buildings, institutions, TPO and PVC membranes, roof coatings and commercial roof compliance.
- manhattanroofing.nyc — our Manhattan work, plus roof decks, skylights, parapet repair and the roofing guides.
The reason the house roofs sit here rather than on the roofing sites is in the city’s own property data. Manhattan has about 4,200 one- and two-family lots. Queens has roughly 247,000, Brooklyn 156,000, Staten Island 108,000 and the Bronx nearly 51,000. Pitched roofs are a house phenomenon, and houses are an outer-borough phenomenon — which is the same reason this company’s home base is the Bronx.
Where the roof meets the rest of the building
Most of what we do is masonry and waterproofing, and on a house roof that is an advantage rather than a digression, because the leak is often not in the roof field at all.
- The chimney. A chimney that has lost its crown or its mortar takes water in at the top and delivers it to the ceiling below, and the roof gets blamed. That is chimney repair, and it is cheaper done while there is already access. The flashing where the chimney meets the roof surface is the roofing side of the same detail, and it is covered on manhattanroofing.nyc.
- The wall under the eaves. Water running off a roof edge onto brickwork soaks the wall rather than the roof. That shows up as damp coming through the wall.
- Open mortar joints near the roofline. The top courses of a house weather worst, and they are the hardest to see from the ground. They are a pointing job.
When we look at a roof we look at those too, and say which one is actually leaking. It is the one part of this work where doing several trades is worth something to the customer instead of just to us.
How the estimate works
Every estimate is an itemised written scope of work, with exclusions stated. For a house roof that means the layer count and whether a tear-off is required, the underlayment by roof section and slope, how far the ice barrier runs, the flashing being replaced rather than reused, and what happens if the deck turns out to be soft, priced in advance.
Half when the work starts, half on completion. Certificate of insurance available on request, and our licence can be checked against the city register from our credentials page.
If you have another written quote, send it with your photos. On a roof it is usually possible to tell from the wording alone whether the person who wrote it has counted the layers and measured the pitch.
Get the roof looked at
Photographs from the ground, and from an upstairs window of a neighbouring house if you can, tell us a great deal: the pitch, the condition of the edges, the state of the chimney. Call (929) 412-6597 or use the estimate form.
Houses across The Bronx, Queens, Brooklyn, Manhattan and Staten Island