Roof replacement
A replacement is the right answer less often than it is sold, and it is the only answer when it is. This page is mostly about telling the two apart, because that judgement is worth more to you than anything else on it — a replacement is the largest single thing most owners will spend on the outside of their building.
- NYC DCWP licensed
- Flat and pitched
- Free written estimate
Call (929) 412-6597 Send photos of the roof
When a repair is the honest answer
If the failure is in one place, the rest of the surface still has life in it, and the deck underneath is sound, you want a repair. A single failed seam, a split at the parapet base, a drain that was never sealed properly: none of those is a reason to take off a roof that has ten years left.
We will say this even when the replacement is the bigger job, and we would rather say it on the first visit than be the second contractor you call after someone else replaced a roof that did not need replacing. Flat roof repair covers what a real repair involves.
When it genuinely needs replacing
- The deck is going. Soft, springy boards underfoot, or daylight and sag visible from inside. Once the structure under the covering has gone, nothing applied on top of it is a repair.
- The failure is general rather than local. Splits, blisters and alligatoring across the whole field rather than at one edge. Patching a surface that is failing everywhere is a subscription, not a repair.
- It has already been recovered as far as it can go. A roof can only carry so many layers before the next one has to be a tear-off.
- Wet insulation over a wide area. Water trapped in the layers keeps working on the deck whatever you do to the top surface.
- It is simply old and you are about to do other work. If scaffolding or a lift is going up for facade work anyway, replacing a tired roof in the same mobilisation is cheaper than doing it on its own in three years.
The tear-off is where the surprises are, so we price them in advance
Nobody knows what the deck looks like until the old covering comes off. That is not evasion, it is the nature of the job: the boards are under two or three layers of roofing and the only way to see them is to remove those layers.
What we do about it is state the assumption in writing. The estimate says how much deck replacement is included, what the rate is beyond that, and what we will do if we find something structural rather than just soft. You approve the number before the work starts instead of hearing it from someone standing on your roof with the covering already off. How we price explains the rest.
The other thing a tear-off exposes is the parapet. On an attached building the wall and the roof meet at the one place most likely to be in poor condition, and it is far cheaper to repoint or rebuild a parapet while the roof is open than afterwards. We will tell you what we find there and what it costs, and because it is our own trade it does not become a second contractor and a second mobilisation. That work is facade and masonry.
What the code adds to a replacement
A repair and a replacement are not the same job in the eyes of the Building Code, and this is a real cost difference rather than a technicality. Section 1504.9 sets a reflectance standard for roof coverings, in two tiers divided at a slope of two units vertical in 12 horizontal.
- At or below two in 12 — every flat and low-slope roof — the covering has to reach 0.70 initial solar reflectance with 0.75 thermal emittance, or a Solar Reflectance Index of 82. This is the rule people know as the white roof.
- Above two in 12, the bar drops to 0.25 reflectance with the same emittance figure, or an SRI of 39 — and the section exempts several materials outright, including metal, slate, clay and concrete tile. Asphalt shingle is not among them.
So the surface you are allowed to finish with is partly decided by the slope and the material, not only by preference. The pitched-roof page goes through the exemptions in detail. Larger buildings have further obligations around roof surfaces that go beyond this page; our commercial site covers that side.
What we will not do
We will not quote a replacement from a photograph of a ceiling stain, and we will not use a leak as the moment to sell one. A leak needs stopping; the replacement decision deserves a dry day and a proper look. If it is leaking now, deal with that first.
We advertise no manufacturer certification, because we hold none on file. Material warranties come from the manufacturer of the material and we pass on whatever the product carries, unchanged and in writing. Our own warranty covers our workmanship and is one sentence long: Two-year written warranty on our workmanship, from the day the job is signed off.
Living with the work
A tear-off is loud, dusty and unavoidably disruptive for the top floor. On an attached house the debris has to come down past your neighbours, which means protection and agreement before anyone starts rather than an apology afterwards. Weather decides the schedule more than we do: an open roof cannot be left open, so the work is planned around dry days and the roof is made watertight at the end of each one.
How long a new roof should last
The honest answer is that service life depends far more on the details than on the material. A membrane laid over a sound, dry deck, with the parapet flashing done properly and the drainage working, outlasts a better product installed over wet insulation and a tired parapet — every time, and not marginally.
That is why we spend the estimate talking about the deck, the parapet and the drains rather than the brand name on the roll. If a quote you are comparing names a product and a warranty length but says nothing about what is underneath, it is describing the one part of the decision that costs least to get right. Ponding water is the clearest example: a roof that holds water after every rain is being worked on constantly by freeze and thaw, and no covering survives that for its rated life.
The one maintenance habit worth having afterwards is unglamorous and free: keep the drains and the leader clear, and look at the roof twice a year and after any heavy storm. Most of the replacements we are called to look at became replacements because a small failure went unnoticed for three winters.
What it costs
Written and itemised after a look, never a figure on the phone. The number moves on the area, the number of existing layers to come off, how much deck is replaced, the parapet and flashing work, access, and the covering you choose. The only genuinely unknown one is the deck, and the estimate prices that as a stated assumption rather than leaving it open.
Already have a written quote? Send it over. We will go through it with you line by line, tell you what it covers and what it leaves out, and give you ours against the same scope.
The Bronx, Queens, Brooklyn, Manhattan and Staten IslandGet it looked at properly
Send photographs from a window or a neighbouring building, and anything visible from inside the top floor. From those we can usually say over the phone which conversation this is — repair or replacement — before anybody drives out to you.