Kitchen remodeling in New York City
Almost every kitchen quote you collect will be built around cabinets, counters and appliances, because those are the things you can picture. The price difference between the quotes, and nearly all of the risk in the job, sits somewhere else entirely: in whether the sink, the range and the circuits stay where they are.
- NYC DCWP licensed
- DOB-registered General Contractor
- Free written estimate
Call (929) 412-6597 Send photos on WhatsApp
The one question that decides your budget
Are you keeping the layout, or changing it?
A kitchen where the sink, the range and the fridge stay in their existing positions is a finishes job: strip out, make good, new cabinets, counter, splashback, floor, lighting where circuits already exist. It is disruptive and it is not cheap, but it is predictable.
Move the sink to the window, put the range on the other wall, or take out the wall between the kitchen and the living room, and the job changes category. Now there is drainage to re-run with the fall it needs, a gas line to move, circuits to add, and — if the wall was doing anything structural — a different conversation again. The cabinets cost the same in both versions. Everything else does not.
We will price both at the first visit where it is useful to, so you can see what the layout change is actually costing you rather than discovering it inside one total.
Who touches the gas, the water and the wiring
On our jobs, plumbing and electrical work is carried out by licensed subcontractors, not by our own crews. In New York that is how the permits work rather than a preference: plumbing and electrical permits are issued separately to the individual licensed contractors who do that work, not to the general contractor running the job. A master plumber pulls the plumbing permit; a licensed electrician pulls the electrical one. We coordinate them and we stand behind the job as a whole.
Gas deserves its own line. Anything involving a gas line — moving a range, adding a connection, capping one off — is licensed plumbing work with its own procedure, and it is the item most often quietly left out of a cheap kitchen quote. If you are comparing quotes and one of them does not mention gas at all while the plan clearly moves the range, that is the gap.
What needs a permit
A like-for-like replacement where nothing moves is at one end; a re-planned kitchen is at the other. The things that reliably bring DOB permits and licensed trades in:
- Relocating the sink, the dishwasher drain or any waste line
- Any gas work, including moving the range
- New circuits, new outlets or panel work
- Removing or adding a wall, or changing what a room is
We work out which of those your kitchen involves before you commit to a design, because the answer changes both the programme and the price. The renovation hub sets out the licence and permit position in full.
Pre-war buildings: what is behind the wall
Most New York kitchens we open up are in buildings older than anyone working on them. Three things turn up often enough to plan for:
- Waste stacks that are not where the drawing says. A century of alterations means the only reliable survey is opening the wall, which is why a layout change is quoted with a stated assumption and a cost if it is wrong.
- Walls that are not square, and floors that are not level. Fitted cabinets assume both. Scribing and packing a run of units into a pre-war room is real work and it belongs in the estimate rather than in the last two days of the job.
- Asbestos and lead paint. Old floor tiles, their adhesive and pipe lagging are common asbestos locations, and lead paint is routine in buildings of that age. Both are licensed specialist work that we do not self-perform. If demolition looks likely to disturb either, testing happens before, not after.
Two things nearly every kitchen quote leaves out
Where the extraction actually goes. A range hood that vents to the outside needs a duct route, and in a pre-war apartment that route often does not exist. What gets installed instead is a recirculating hood with a charcoal filter, which removes smell and grease but not heat or moisture. That is sometimes the only option, and it is a perfectly honest one — but it should be a decision you made rather than something you discover when the hood goes up. We say which you are getting, and why, in the estimate.
Whether the electrical supply can carry the new kitchen. Kitchens have gained appliances faster than old buildings have gained capacity. An induction range in particular is a different proposition from a gas one: it wants its own high-capacity circuit, and in some older buildings the supply to the apartment simply will not take it without work upstream. If you are moving from gas to induction, this is the question to settle before you buy the range, not after it is delivered.
Both of these are checked by the licensed trades at survey rather than assumed, and both appear in the estimate as named items.
If you are in a co-op or condo
Expect an alteration agreement before anything starts, and expect the building to care about two things in particular in a kitchen: wet-over-dry, meaning whether your new sink would sit above a neighbour’s bedroom or living room, and the noise-and-hours rules. Both are the building’s rules rather than the city’s, and both are easier to design around at the start than to appeal later.
We will provide the certificate of insurance in the form your managing agent requires, naming them, which has to be arranged with the insurer rather than typed in by us. Certificate of insurance available on request.
How long you will be without a kitchen
Honestly: longer than the build. The part people underestimate is lead time on cabinets and counters, not the work itself, and a stone counter cannot be templated until the units are actually installed and level. So the sequence has a built-in pause in the middle, and anybody promising you a two-week kitchen with a stone top is describing a timeline that does not include the template.
We set the dates out in the estimate, including that gap, and we will tell you at which point you lose the sink and at which point you get it back.
Ordering: the decisions to make before we start
The jobs that run late almost never run late because of the building work. They run late because a decision was still open when the trade that needed it arrived. The ones worth settling before day one:
- The appliances, specifically their real dimensions and services. A cabinet run is set out around them, so a change of fridge late on is a change of carpentry.
- Gas or induction, which decides both the plumbing and the electrical scope.
- The sink and tap, because the cut-out and the holes are made from the actual item, not a catalogue drawing.
- Where you want the sockets, before the walls close. Adding one afterwards means chasing a finished wall.
We give you that list with the estimate and a date against each one, so it is clear what is holding what rather than it becoming a conversation about blame later.
What it costs
Every estimate is an itemised written scope of work, with exclusions stated. Half when the work starts, half on completion. The number moves on whether the layout changes, the licensed trades involved, the condition behind the walls, the building’s own requirements if it has them, and your choice of cabinets and counters — which is the one part fully under your control.
We quote the licensed trades as named line items rather than folding them into a round sum, so you can compare them against anyone else’s quote. Our workmanship warranty: Two-year written warranty on our workmanship, from the day the job is signed off.
Already have a written quote? Send it over. We will go through it with you line by line, tell you what it covers and what it leaves out, and give you ours against the same scope.
The Bronx, Queens, Brooklyn, Manhattan and Staten IslandSend photographs of the kitchen as it is
Each wall, the window, where the sink and the range are now, and the ceiling if there are pipes or a bulkhead in it. Tell us whether it is a house, a co-op or a condo, and whether you want the layout to change.